PW
Subscribe

Login

I forgot my password
Login
  • Sample
  • Subscribe
  • D-P-R
  • Tenders
  • Rigwatch
  • LNG-DIPLA
  • WellsIndia
  • Events
  • About
  • Contact

Crystal Sea back at Mumbai docks for repair

Vol 10, PW 18 (11 Jan 07) News in Brief
       

Problems continue to beset Crystal Sea, a Floating Production Storage and Offloading (FPSO) unit hired by ONGC to restore full production at the Mumbai High oilfield following a devastating fire on 27th July 2005....

Buy this article forRs490 $9

For a 30-article or annual subscription rates click here

Next
  • PGS wins 3D contract from Essar in Myanmar

Back
  • GSPC must drill more wells at Deen Dayal

Related
  • Jindal claims $15m from ONGC in old FPSO row (08 Sep 22)

  • No expense spared to restore Panna production (09 Sep 10)

  • Disaster averted at PMT (20 May 10)

  • Rig only requirement welcomed in ONGC floater tender (06 Mar 08)

  • Crystal Sea back at Mumbai docks for repair (11 Jan 07)

  • Crystal Sea reaches MHN in September (10 Aug 06)

  • Slow repair work for Sea Drill-5 (04 May 06)

  • Noble Drilling rig for ONGC at $140,000 per day (20 Apr 06)

  • ONGC hires Crystal Sea for Mumbai High North (17 Nov 05)

  • Time to repair ONGC's fleet of 129 drilling rigs (05 Jun 02)

Most Read
  • AK Singh confirmed as ONGC Chm but not MD

  • Outsider needed to re-boot GAIL marketing

  • AK Singh tells ONGC to 'out-source' more

  • Oil India i/vs for CGMs and EDs

  • IndianOil wants to abolish Dir. R&D position

  • Ashu Singhal appointed as new MD at MGL

E-mail a friend


  • Privacy |
  • T&C |
  • Disclaimer
Delivered by Webart Solutions
Your email address is Blocked!

This user e-mail and password ID belongs to someone else or is being used by someone else - contact info@petrowatch.com for a separate company subscription or for inclusion onto your company's authorised distribution list. Unauthorised circulation of Petrowatch is not permitted