LNG terminal operators back GSPL for pipeline Vol 23, PW 18 (16 Jul 20) Midstream, Downstream, Renewables Nobody wants to see the Mundra LNG terminal stranded like the Kochi and Ennore LNG... Register here for subscription details Next ONGC reluctant to feed gas into northeast grid Back New IGX rule-book almost ready: Satpal Garg RelatedChhara LNG terminal hostage to GSPL pipeline (13 Jan 22) 'Hub and Spoke' best for Swan LNG, says PIL (26 Aug 21) GSPL angry at GAIL pipeline plan for Swan (29 Jul 21) Wildlife approval for 86-km R-LNG pipeline soon (14 Jan 21) Shell calls for single gas transmission tariff (13 Aug 20) LNG terminal operators back GSPL for pipeline (16 Jul 20) GSPL plans Chhara R-LNG pipeline (13 Feb 20) GSPL works on crucial Mundra LNG gas pipeline (08 Mar 18) Anger at GAIL-GSPL over freelance pipelines (16 Nov 17) HPCL wins GSPL pledge for R-LNG pipeline (05 Jun 14)