Oil India wants well design consultant Vol 23, PW 4 (19 Dec 19) News in Brief If successful, Oil India will have stumbled on a neat solution to bypass inevitable... Register here for subscription details Next More delay in first 98/2 gas Back Total wants Mundra LNG up and running RelatedOil India wants well design consultant (19 Dec 19) ONGC wants Nagayalanka consultant (21 Feb 19) H-Energy wants Jaigarh design change (24 Sep 15) ONGC wants KG drilling consultant (02 Jul 15) ONGC: Looking for a HP/HT well consultant (26 Mar 15) Oil India needs drilling consultant (19 Jun 14) 'Only a foreign consultant will do,' says Oil India (08 May 14) Oil India drills well (03 May 12) GAIL-Vadodara JV wants consultant (03 Dec 09) Wanted ' consultant for Oil India (08 Mar 07)